Shed, RV, carport & garage pads

Concrete Slabs in Tucson, AZ

Flat, solid pads with the right thickness and steel for sheds, RVs, carports and workshops.

  • Free on-site measuring visit
  • Written quote with each part of the job priced on its own line
  • Pours scheduled around summer heat and monsoon storms
Concrete Contractors in Tucson, AZ

A Solid Pad for Whatever Sits On It

Concrete slabs give sheds, RVs, trailers, carports, workshops and equipment a level, solid base that does not turn to mud in a storm. In Tucson, many homes on larger lots have room for a side-yard RV pad, a slab for a metal carport, or a workshop out back, and older homes often have a cracked carport slab that has settled over the decades.

Matching the slab to the load

Thickness and reinforcement depend on what the slab will carry. HomeGuide's slab guide lists 4-inch slabs at $6 to $8 a square foot and 6-inch slabs at $8 to $10, and notes that larger slabs may need wire mesh, rebar or thicker edges. As a general rule:

  • Sheds and small storage buildings: usually a 4-inch slab
  • Carports and garage floors: 4 to 6 inches with reinforcement
  • RV and trailer pads: thicker, with steel, especially where the wheels and jacks rest
  • Workshops and heavy equipment: sized to the equipment, sometimes with thickened areas under machines

If a structure will be built on the slab, its anchor bolts or post brackets need to be placed during or right after the pour, so we coordinate with whoever is supplying the building.

Permits for outbuildings

The City of Tucson's residential permit page says detached accessory structures over 200 square feet, such as storage sheds, need a permit, and that garages need one too. Walls and fences need a site plan review for zoning, and those over 7 feet need a building permit with an engineered design. Towns and unincorporated Pima County have their own rules. We check what your project needs before the slab is poured, because the slab often has to meet the building plans.

Ground and drainage

We clear the area, dig out soft soil and break through caliche where needed, then compact a base. The slab is set slightly higher than the surrounding ground and sloped so storm water runs off rather than pooling against a shed wall or under a garage door. For RV pads that connect to the driveway, we match the grade so the transition is smooth.

Get a Free Estimate

Pouring and curing

Slabs are poured early in the day during hot months, finished to the right texture for their use (broom for outdoor pads, smoother for workshop floors), and jointed so cracks stay controlled. HomeGuide says to keep vehicles off a new slab for 1 to 2 weeks and gives 28 to 48 days for a full cure. For an RV pad, that means waiting before parking the full weight of the vehicle on it.

Replacing an old carport slab

Many Tucson homes from the 1950s through the 1980s have carport slabs that have cracked and dropped. HomeGuide puts removal of an existing slab at $3 to $8 a square foot including disposal. When a carport roof stays in place, we work around the posts and pour a new slab sloped away from the house.

Slabs We Pour

Each one sized and reinforced for its use.

Shed pads

Level slabs for storage sheds and small outbuildings.

RV and trailer pads

Thicker, reinforced pads, often off the side of the driveway.

Carport slabs

New or replacement slabs under metal or attached carports.

Garage and workshop floors

Reinforced floors for detached garages and shops.

Equipment pads

Small pads for AC units, pool equipment, generators and trash bins.

Stamped & Decorative Concrete in Tucson, AZ

Typical Concrete Slab Costs

ItemPublished range
4-inch slab, per sq ft installed$6 to $8
6-inch slab, per sq ft installed$8 to $10
10 x 10 ft slab$600 to $1,200
20 x 20 ft slab$2,400 to $4,800
Two-car garage floor$2,400 to $6,900
RV pad, 200 to 700 sq ft$1,200 to $8,400
Gravel base, per sq ft$1 to $3
Old slab removal, per sq ft$3 to $8

Figures from HomeGuide's concrete slab cost guide (national averages). Tucson pricing can be higher or lower, and size, access, removal and finish all change the total. Your written estimate after we measure is the price.

How a Slab Gets Poured

1. Plan the slab

We measure and talk through what will sit on it and any building plans.

2. Permit check

We confirm what the city, town or county requires for your project.

3. Prep and forms

Digging, base compaction, forms, steel and any anchors set.

4. Pour and cure

An early pour, the right finish, joints and curing, with dates for use.

Pool Decks in Tucson, AZ

Why Choose Us for Concrete Slabs

Sized to the load

Thickness and steel matched to sheds, RVs or equipment.

Ready for the building

Anchors and dimensions coordinated with your shed or carport supplier.

Concrete Slabs Questions

How thick should a shed slab be?

Most storage sheds sit on a 4-inch slab. A heavier building or one storing equipment may need more, and we size it to your shed.

Do I need a permit for a shed in Tucson?

The City of Tucson's residential permit page says detached accessory structures over 200 square feet, like storage sheds, need a permit. Rules differ in nearby towns and unincorporated Pima County, so we check your address.

How big should an RV pad be?

Measure the RV with its slide-outs open and add room to walk around it. HomeGuide's RV pad range covers 200 to 700 square feet; we size the pad to your vehicle and how you back it in.

How much concrete do I need?

HomeGuide says one cubic yard covers about 81 square feet at 4 inches thick. A 10 by 20 foot pad at 4 inches takes roughly 2.5 yards, plus a little extra for waste.